Short answer

New electrical wiring for a house in North Macedonia (2026) costs roughly: 100 m² - 120.000-190.000 MKD (~2.000-3.100 €), 150 m² - 180.000-280.000 MKD, 200+ m² - 260.000-430.000 MKD, materials and labour together. The exact price depends on the number of circuits, the materials and any additional systems. Elektro TR gives a free estimate in the Skopje region - 070 393 045.

“How much would it cost to do all the wiring in a new house?” - this is one of the most common questions we get. The answer, as with most building work, is: it depends. But not all of us are aware of what it depends on, and by how much.

In this article you will find concrete figures for typical Macedonian conditions in 2026, and you will understand what drives the final price.

Please note

The prices below are indicative and apply to standard electrical installations in the Skopje region in 2026. For an exact price for your house we need to assess it on site - free of charge within the region.

What affects the price?

When we talk about wiring a new house, the price is set by five main factors:

  1. The floor area of the building - more m² means more cable, sockets and lighting
  2. The number of rooms - every room needs its own circuit for lighting and sockets
  3. The capacity of the distribution board - 35A, 63A or 80A
  4. The type of materials - copper cable, socket quality, type of RCD
  5. Additional systems - smart lighting, EV charger, outdoor lighting, video surveillance

Indicative prices for 2026

These prices apply to a standard set of wiring (no smart systems), materials and labour together. The materials include cable, sockets, the board, circuit breakers and light fittings; the work on a house of around 100 m² usually takes 4-7 days with a team of 2 people.

Floor area Materials Labour Total
100 m² ~80.000 - 120.000 MKD ~40.000 - 70.000 MKD 120.000 - 190.000 MKD (~2.000-3.100 €)
150 m² ~120.000 - 180.000 MKD ~60.000 - 100.000 MKD 180.000 - 280.000 MKD (~2.900-4.500 €)
200+ m² ~180.000 - 280.000 MKD ~80.000 - 150.000 MKD 260.000 - 430.000 MKD (~4.200-7.000 €)

What is a “standard set”?

By standard wiring we mean:

  • A main distribution board with circuit breakers and RCD protection
  • Separate circuits for: general sockets, kitchen, bathroom, water heater, air conditioning, lighting
  • Earthing and a lightning conductor (if the building is not connected to an existing one)
  • 3-4 sockets per room, 1-2 lighting points
  • Cabling for a video intercom, thermostats and an alarm (cabling only, not the equipment)
  • A test certificate for the installation once the work is complete

What pushes the price up?

Smart systems (smart home)

KNX or a similar smart system adds 30-60% to the base price. It gives you central control, scenes, voice commands and so on. Worth it if you are a technical person and want maximum control.

EV charger for the garage

11kW charger: ~25.000-45.000 MKD (including the equipment). 22kW charger: ~40.000-70.000 MKD. It needs a dedicated circuit, protection and sometimes an upgrade to the main distribution board.

Outdoor lighting and the garden

A garden with 10-15 lighting points (terrace, paths, garage, facade): ~30.000-60.000 MKD. It depends on the distances involved and the type of lighting (standard LED vs IP65 decorative).

Preparation for solar panels

Preparing the roof and the board for a future photovoltaic system (not including the system itself): ~15.000-25.000 MKD. When the panels go up later, you avoid opening up the walls all over again.

Be wary of these “offers”

Offers under 50.000 MKD for the complete wiring of a 100 m² house should raise suspicion. It usually means: aluminium cable instead of copper, undersized circuits, sockets with no earthing, or work with no certificate. Saving now = a big bill in 3-5 years.

How do you get the best price?

1. Get 2-3 estimates

A free assessment from 2-3 different electricians gives you a realistic picture of the market price. Be careful - the lowest price is not always the best.

2. Ask about the invoice and the warranty

Only licensed electricians can issue an invoice and a test certificate for the installation. This is essential if you want to insure the house and to sell it later on.

3. An exact specification before work starts

Before you agree the job, ask for a written specification covering: the number of sockets, the lighting points, the type of circuit breakers, and every additional service. That way there are no surprises at the end.

4. Think long term

Saving on material quality today turns into expensive repairs in 5-10 years. Copper cable (rather than aluminium), branded circuit breakers (Schneider, ABB, Legrand) and quality sockets last 30+ years without trouble.

Planning a new house?

Elektro TR comes out for a free assessment in the Skopje region. After the inspection you get an exact price, a timeframe, and a list of the materials needed - in writing.

Call: 070 393 045

Conclusion

Wiring is 5-10% of the total cost of a new house, but it affects the safety, the comfort and the operation of every other system. Do not cut corners on materials or workmanship - choosing a trustworthy, licensed electrician is an investment that pays for itself with decades of trouble-free service. For an exact price for your project, ask for an estimate - free, with no obligation.

Do you need an electrician?

Free estimate and a fast callout in Skopje and across North Macedonia.

070 393 045
Call us: 070 393 045